Industrial Manufacturing Facility
A 45,000 sq ft PEB manufacturing facility with integrated administrative offices, delivered in 9 weeks with zero production downtime for the phased occupancy plan.
From large-span PEB factories and geometric space-frame roofing to mezzanine floors and prefab homes — Hexcentric designs, fabricates, and installs complete structural solutions from our SIDCO facility in Coimbatore.
Why Hexcentric
Three pillars that make us Tamil Nadu's preferred structural fabrication partner for complex, high-specification projects.
Hexagonal space frames, multi-angled truss systems, and precise water-runoff-optimised ridge geometries. We engineer structures that conventional fabricators won't attempt.
Explore structural fabrication3D structural modelling, FEA wind load analysis, factory fabrication at our SIDCO plant, and on-site erection — all delivered by one coordinated team. No subcontracting, no handover gaps.
Our processMill test certificates on every steel batch, QCO-compliant fasteners, IS 875 & IS 800 certified structural calculations, and INSDAG design frameworks. Full compliance documentation on handover.
View complianceWhat We Build
From flagship geometric space-frame roofing to lightweight aluminium cladding — every service is delivered with the same engineering rigour.
Custom geometric steel frameworks, hexagonal space frames, and multi-angle truss systems.
Learn more
Pre-Engineered Buildings with wide clear spans up to 60m, factory-fabricated and site-erected.
Learn more
Complete industrial shed roofing systems — steel sheeting, insulation, and rainwater drainage.
Learn more
Freestanding structural mezzanine systems doubling your usable floor area without new construction.
Learn more
Steel-framed commercial and industrial multi-storey structures with full design integration.
Learn more
Engineered prefabricated residential structures — quick, durable, and thermally efficient.
Learn more
Natural daylight roofing systems reducing artificial lighting costs by up to 70% in industrial spaces.
Learn more
Architectural fabric & cable tensile roofing — expressive, lightweight, and weather-resistant.
Learn more
Chemical and corrosion-resistant UPVC sheet roofing for pharmaceutical, chemical, and food industries.
Learn more
Lightweight, hygienic aluminium roofing ideal for food processing, pharma, and clean-room environments.
Learn more
Complete building envelope and elevation systems — metal, composite, and architectural cladding panels.
Learn moreCompleted Projects
50+ projects delivered across Tamil Nadu. Here are three that represent our engineering capabilities at scale.
A 45,000 sq ft PEB manufacturing facility with integrated administrative offices, delivered in 9 weeks with zero production downtime for the phased occupancy plan.
A 28m clear-span steel warehouse shed with 12m internal clearance height for racking systems, complete with polycarbonate skylight ridges for natural illumination.
A 4,200 sq ft structural steel mezzanine floor installed in an existing retail complex, with full fire-rating compliance and zero disruption to ongoing trading operations.
Client Voices
"We had concerns about the complex hip roof angles over our chemical processing area. Hexcentric produced FEA documentation before a single beam was ordered. The structure has been leak-free through two monsoons."
"They delivered a 28,000 sq ft warehouse shed in 8 weeks — on time, on budget. The polycarbonate ridge lighting alone has saved us ₹40,000/month in electricity. Professional team from day one."
"The mezzanine installation was completed without closing our store for a single day. The design team was thorough, answering every question with engineered data. I would recommend Hexcentric to any business owner."
"Their UPVC roofing for our pharmaceutical facility passed our stringent clean-room certification audit without a single remedial item. Rare for any construction contractor in Coimbatore."
"The tensile canopy over our hotel entrance has become a landmark in the area. Hexcentric handled design, fabrication, and installation flawlessly. The project finished 4 days ahead of schedule."