Case Studies

50+ Projects Delivered
Across Tamil Nadu

From single-span factory sheds to complex multi-building PEB campuses — every project is delivered with full engineering documentation and IS code compliance.

50+Projects Completed
TN-WideService Coverage
100%On-Time Delivery Rate
IS 800All Projects Compliant

Project Portfolio

Industrial manufacturing PEB facility with integrated office
PEB + Office

Industrial Manufacturing Facility

A textile manufacturing client in Tirupur required a 45,000 sq ft PEB facility with integrated administrative offices, a central corridor crane beam, and polycarbonate skylight ridges for natural lighting. The challenge: phased occupancy with production commencing in Phase 1 before Phase 2 construction started.

The Hexcentric Solution

Designed a structurally independent Phase 1 / Phase 2 PEB system with a shared expansion bay. Phase 1 (30,000 sq ft) was handed over in Week 7; Phase 2 (15,000 sq ft + offices) completed in Week 9 without interrupting production.

Total Area45,000 sq ft
Clear Span36 metres
Delivered9 Weeks
Start a similar project
High-clearance steel warehouse and logistics hub
Warehouse Shed

Warehouse & Logistics Hub

A Coimbatore logistics operator needed a 28m clear-span warehouse shed with 12m internal clearance for automated racking systems. The site was in a coastal wind zone (Vz = 47 m/s) requiring detailed IS 875 Part 3 wind load analysis.

The Hexcentric Solution

Developed a tapered I-section portal frame with moment-resisting knee joints, designed for Vz = 47 m/s. Integrated 6 polycarbonate skylight ridges providing natural illumination equivalent to 240 LUX without artificial lighting during daytime — saving ₹40,000/month in electricity.

Clear Span28 metres
Eave Height12 metres
Wind Zone47 m/s
Start a similar project
Commercial facility steel mezzanine floor expansion
Mezzanine Floor

Commercial Facility Expansion

A busy retail showroom in Coimbatore required a 4,200 sq ft mezzanine floor above their ground-floor trading area. Key constraint: installation had to proceed during trading hours without closure, with zero disruption to customers below.

The Hexcentric Solution

Pre-fabricated all steel sections at our SIDCO workshop. On-site installation used a night-work programme (6 PM to 6 AM) with noiseless bolted connections. The mezzanine was erected, decked, and handrailed in 4 nights — the client never closed for a single trading day.

Mezzanine Area4,200 sq ft
Load Rating5 kN/m²
Fire Rating60 min
Start a similar project
Hexagonal space-frame commercial canopy structure
Geometric Space Frame

Hotel Entrance Canopy — Geometric Space Frame

A hexagonal space-frame canopy spanning 18m × 12m with tensile PTFE fabric infill panels. FEA-designed for wind uplift; delivered 4 days ahead of hotel opening date.

Span18 × 12 m
TypeSpace Frame
Start a similar project
Food processing PEB facility with UPVC roofing
PEB + UPVC Roofing

Food Processing Facility — PEB with UPVC Roof

A 22,000 sq ft PEB facility for a food processing client with GMP-compliant UPVC roofing and full HACCP-ready interior finishes. Delivered in 8 weeks.

Area22,000 sq ft
Timeline8 Weeks
Start a similar project
ACP composite cladding facade industrial building
ACP Facade Cladding

Industrial Building Facade Upgrade

Complete ACP composite panel facade cladding for a 3-storey industrial building in Salem, including thermal insulated sandwich panel wall system and aluminium louvres.

Facade Area8,400 sq ft
LocationSalem, TN
Start a similar project

Common Questions

Frequently Asked Questions

Your Project, Next

Ready to Add Your Project to This Portfolio?

Request a free site assessment. We'll visit, evaluate, and provide a detailed preliminary proposal within 72 hours.

Request Free Assessment Chat on WhatsApp